When two sources report different readings for the same meter interval, which value should your team use for settlements? In this webinar replay, Dave Almsted walks through how MCG Energy Accounting Software (EAS) ranks meter data sources, flags suspect values, and prepares interval data for ISO market submission.
Watch the energy accounting software demo
Jump to a topic on YouTube
How does EAS turn meter readings into a market submission?
EAS can keep several data profiles for one meter and use configured priorities to select an official value for each interval. Teams can review validation exceptions, trace calculated totals back to individual meters, and choose which profile and meters to send through a market interface. The recording shows how those steps work together.
1. Choose the source for the official interval value
A meter may have a reading from an energy management system (EMS), an MV90 profile, or a manual entry. The demo shows how to rank these sources so EAS can use the highest-priority available value for that interval. Dave also shows how user-defined fields help teams filter and group meters.
2. Trace a site total back to its meters
In the demo, several battery meters roll up into an Oregon site total. EAS lets the user drill into the calculation to see which meters contribute to the total. This is helpful when a site-level value looks off and the team needs to find the underlying reading or calculation.
3. Flag readings that fall outside a configured range
A validation exception gives the team a specific interval to investigate. Dave demonstrates a simple range check and explains how teams can also flag readings that remain unchanged or jump sharply between intervals.
| Check | Demo result |
|---|---|
| Configured range | −21 to +21 |
| Incoming reading | −88 |
| What EAS flags | The reading falls below the configured minimum. |
| What the team reviews | The flagged interval and available source profiles before making a correction. |
The limits are specific to this demo meter. Set thresholds for the meter and workflow your team is managing.
4. Configure an hourly ISO market submission
Using Southwest Power Pool (SPP) as the example, Dave selects the meter profile, chooses which meters to include, and shows how to map them to market nodes. He also walks through automated submission timing, submission logs, and the option to run an ad hoc submission. These are practical steps for teams performing Meter Data Management Agent (MDMA) functions.
5. Compare load forecasts with actuals
The reporting demo shows a dashboard that brings the forecast and actual load into one view and calculates the difference. The final Q&A looks at bidirectional metering, including how the demo represents battery charging and discharging.
Download the MCG Energy Accounting System brochure (PDF)
Talk through your meter data workflow
About the speaker
Dave Almsted leads the commercial Energy Product Analyst team at MCG Energy Solutions. In this webinar, he walks through EAS from the perspective of teams that need to trace a meter value, investigate an exception, and prepare data for the market.
Connect with Dave Almsted on LinkedIn or email dalmsted@mcgenergy.com to talk about your business.
Marketing Coordinator at MCG Energy Solutions
